Case Studies
Manual TIG Hits 15% Reject Rate on 316L Pipe by...
Manual TIG on 316L pipe hits 8–15% reject rates by mid-shift. See how orbital weld heads and a single power source fix it.
Manual TIG Hits 15% Reject Rate on 316L Pipe by...
Manual TIG on 316L pipe hits 8–15% reject rates by mid-shift. See how orbital weld heads and a single power source fix it.
316L Stainless from 1/4-Inch Tubing to 8-Inch S...
One contractor, one shift, 6.35 mm to 203 mm OD in 316L stainless — how open and enclosed orbital heads close a 32:1 diameter gap.
316L Stainless from 1/4-Inch Tubing to 8-Inch S...
One contractor, one shift, 6.35 mm to 203 mm OD in 316L stainless — how open and enclosed orbital heads close a 32:1 diameter gap.
From 15% Rework to Under 3%: Welding 2-Inch Sch...
A Colombian contractor cut weld time from 15 min to under 5 min and rework from 15% to under 3% switching to orbital TIG on thin-wall DN50 pipe.
From 15% Rework to Under 3%: Welding 2-Inch Sch...
A Colombian contractor cut weld time from 15 min to under 5 min and rework from 15% to under 3% switching to orbital TIG on thin-wall DN50 pipe.
316L Sanitary Tube Welding in Ecuador: How Orbi...
Manual TIG on 316L sanitary tube runs 8–15% reject rates. See how orbital automation closed that gap on food-grade piping in Ecuador.
316L Sanitary Tube Welding in Ecuador: How Orbi...
Manual TIG on 316L sanitary tube runs 8–15% reject rates. See how orbital automation closed that gap on food-grade piping in Ecuador.
30–40% Undercut Rate on 200mm+ Pipes Eliminated...
Manual TIG left 30–40% of large-diameter joints defective. Open-head orbital welding cut cycle times 60–70% and hit EN 13480 on every pass.
30–40% Undercut Rate on 200mm+ Pipes Eliminated...
Manual TIG left 30–40% of large-diameter joints defective. Open-head orbital welding cut cycle times 60–70% and hit EN 13480 on every pass.
25 mm to 150 mm OD Carbon Steel Pipe Welding at...
A Kazan construction project needed orbital welding across a 6:1 diameter ratio at 40 m elevation. Here's how one system handled it.
25 mm to 150 mm OD Carbon Steel Pipe Welding at...
A Kazan construction project needed orbital welding across a 6:1 diameter ratio at 40 m elevation. Here's how one system handled it.